7  Flooring workers time 7.00 to 5.00 pm installing

       4 pcs mb-cd-vaoc
       1 pcs mb-cd lbo4
       4 pcs mb-cd-wco6
       2 pcs  mb-cf-xco1
       5 pcs mb-bd-kbo1

2 electric workers time 7.30 to 3.30 pm

2 workers California Green Solar

3 framer workers

GBR cover the floor on the basement & remove four beam on dining & make it big the hole on the sprinkler & measure the laundry

2nd Floor Hallway