7 flooring workers time 7.00 to 5.00 pm installing
pulll same granite & lay done to the floor & mark the floor
2 electric workers
Danny time 730 to 330
Danny labor 900 to 330
Danny boss visit only
GBR installing
Cabinet, bring door on basement & cover the floor on the second floor