7 flooring workers time 700 to 1200 installing
       1 pcs  mb-bd-hco5
       1 pcs mb-gt-wdo1
       1 pcs mb-cf-wdo2
       1 pcs ig13
       1 pcs on base-men t stair

2 labor workers time time 700 to 330

Thin-Set Material used by marble:
            Beginning Balance:       39 bags
            Used:                                5 bags
            Ending Balance:            34 bags

Silver Sand Material used by marble:
            Beginning Balance:      39 bags
            Used:                                1 bag
            Ending Balance:           38 bags