7 flooring workers time 700 to 500 Installing
       1 pcs a1
       1 pcs a2
       10 pcs ify1
       2 pcs mb-cp-gco1

1 worker labor

1 container 

7 flooring workers time 700 to 1200  installing
      3 pcs mb-bd-fco2
      2 pcs ify1
      1 pcs a3
      1 pcs a2

Thin-Set Material used by marble:
            Beginning Balance:       128 bags
            Used:                                  8 bags
            Ending Balance:            120 bags

Silver Sand Material used by marble:
            Beginning Balance:      46 bags
            Used:                                0 bag
            Ending Balance:           46 bags