ROGER REPORT:
2 flooring workers time 700 to 330 Installing
      Grout
      Kimic

GBR crew :
       Gino & Oscar: BP & Palmdale
       Arturo, Eleana, Roger, Jesse & Rigo

Installing
        sand dry wall in the master bath
        make a hole in the the cabinet for the puck light
        putt it back the dry wall on the floor on the kitchen pantry kitchen & the kitchen on the basement
        move some granite on the basement

ELEANA REPORT:

Bevelloni 

a.       Letter à Sent the HOA letters to both Vladimir and Dan.

b.      Landscape à I’ve called Dan multiple times today and did not get a hold of him yet.

c.       Chimney à As for Vladimir he will be working on the chimney drawings to submit to the HOA by Tuesday the 2nd (1 week before the meeting on the 9th). He will also be sending us the chimney diagram/drawing in order for us to create the mock-up and send out for bids. Zuli, Gino, Arturo and I all understand the urgency on this. We also have the framer and the air duct company on standby to meet with us as soon as we can all meet together (G, Zuli, Vladimir, and the subs) with the mock-up and drawings ready.

d.      Site/Construction à FYI Gino has the list of site requirements from the HOA.