7 stone workers time 700 to 500 installing
       1 pcs us
       1 pcs ps
       15 pcs rr4a
       5 pcs 7a
       10 pcs nn
       7 pcs nn1
       18 pcs cc6

Thin-Set used by Stone:
        Beginning Balance:         13 bags
        Used:                                  9 bags
        Ending Balance:                4 bags