6 flooring workers time 7.00 to 5.00 installing

       6 pcs ktco2     
       1 pcs mb-cp-wco4
       2 pcs mb-cd-fbo2
       3 pcs mb-cd-fbo3
       4 pcs mb-cd-wbo1

Material Used by Flooring:
    14 bag thin-set
    6 bag silver sand

Two electric workers time 8.00 to 4.00

GBR move same staff inside & put  topping on the drywall on the waking closet