7 flooring workers time 7.00 to 1.00 pm installing

       3 pcs mb-cd-gco1
      
Material used by Flooring:
       10 bag thin-set
       2 silver sand
       2 sanded grout
       2 rags

GBR installing
        8 wall unit 
        bring door on the basement
        demo same drywall on the master bath